The construction stages of a Gunite swimming pool analytically:
The swimming pool is carved – when the excavation stage is completed, the metallic frame that covers the swimming pool’s curves is positioned, along with the hydrolic standby pipes, pumps, lights and other equipment
Discharge of the liquid concrete that covers the swimming pool’s surface
Covering the mesh
Forming the sides and the floor of the swimming pool
Polishing/grinding the frames
After the swimming pool has been completed, the spa area is formed. After that, the swimming pool is lined with a) Blaster, b) pressed cement, c) quartz sand, d) pebble
Are your interested in this product? Feel free to contact us